
01-10-2009, 11:58 PM
|
 |
THINK, Before You Speak
|
|
|
|
|
|
|
Join Date: May 2003
Posts: 1,783
Points: 43,302,224.59
Bank: 11.52
Total Points: 43,302,236.12
|
|
Quote:
Originally Posted by methomps
There are many different strength of schedule calculations. The one the BCS used to use is this:
SOS= (2/3)(OpWins/(OpWins+OpLosses))+(1/3)(OpOpWins/(OpOpWins+OpOpLosses))
Op= Opponents
OpOp= Opponents' opponents
|
Thanks for clearing that one up.
Peace.
|